Lights Out:
August 26, 2026
Race Time:
9:00 AM WIB/ICTÂ
10:00 AM SGT/MYT/PHT/HKTÂ
VMware vSphere 8 reaches End of Support in October 2027. That deadline may seem distant—but for most organizations, the time required to evaluate, plan, and migrate means the window to act is already shrinking.
Â
Broadcom’s shift to VMware Cloud Foundation (VCF) is not a routine upgrade. It introduces:
Â
- Significant architectural changes
- Rising licensing and infrastructure costs
- Operational disruption across your environment
Why VCF 9 isn’t a simple upgrade
What moving to VCF really entails—and the hidden costs, complexity, and risks many organizations underestimate.
Your alternatives, clearly defined
A practical look at how to reduce cost, avoid unnecessary rearchitecture, and minimize vendor lock-in—without sacrificing performance. Nutanix helps you move forward with:
- Nutanix Unified Storage (NUS): Simplify data management and improve visibility across environments
- NC2 (Nutanix Cloud Clusters): Extend workloads to the public cloud without replatforming
- Migration Incentives: Offset transition costs and accelerate time to ROI
In motorsport, no serious team sends a driver onto the circuit without hundreds of laps in the simulator first. The race is won long before race day.
Your infrastructure decisions deserve the same preparation. Nutanix Test Drive lets you get behind the wheel of the full platform — NKP, Enterprise AI, hybrid cloud, disaster recovery, and more — 100% browser-based, no hardware, no installation, no risk.
Take it for a lap. See exactly what Nutanix can do for your environment before you commit to the race. Start your test drive today!
In motorsport, you don't switch teams mid-season on a hunch. You switch because the data is undeniable–faster lap times, better realiability, a team that actually listens.Â
London Gatwick Airport, Virginia Retirement System, IBC Bank. These aren't small bets. These are organizations that looked at the VMware landscape, ran the numbers, and made the call to move to Nutanix. The verdict? Simpler operations. Lower costs. A platform built for what comes next – not locked into what came before.Â
October 2027 is closer than it looks. Hear what your peers are saying.Â
Lock in your Game Plan 2027 with Nutanix and submit your Grid Strategy.Â
Precision starts with preparation. The Grid Strategy form will be live on August 26 — get ready to build your winning strategy.
Answer four simple questions and you could win $10 SGD Coffee Voucher.
Build your new strategy, piece by piece. Precision engineering takes time – don't sweat the countdown. Nutanix has your back.Â
Nutanix, Inc. is not affiliated with VMware by Broadcom or Broadcom. VMware and the VMware product names recited herein are registered or unregistered trademarks of Broadcom in the United States and/or other countries. All other brand names mentioned are for identification purposes only and may be the trademarks of their respective holder(s).